INDEX OF SALES INSTRUCTIONS 2007

 
 
Sales Instruction No.

Subject

SI
Shifting of NDS/ Industrial connection due to sealing by HUDA/other Govt. agencies
SI
Use of Distribution Transformer by HT Industrial Applicants
SI
Conversion of feeding source from Rural to Urban feeder
SI
Definition of Industrial feeder
SI
Reducing the period of full amount deposit in AP connections
SI
Interest on staff security, meter security and consumption security deposit for the year 2006-2007
SI
Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas - Clarification
SI
Reducing the period of full amount deposit in AP connections
SI
Mode of payment of bills by consumers
SI
Self certification scheme for consumers electrical installation in respect of AP tubewell consumers
SI
Charging of Domestic Supply Tariff to Youth Hostels run by sports departments
SI
Continuous supply to P.P.Yarn Unit and Textile Spinning and Weaving units under essential feeder category
SI
Furnishing information to detect theft of electricity – institution of Award
SI
Installation of Earth Leakage Circuit Breaker (ELCB)
SI
Bill procedure for part period on new connection or disconnection at consumer request
SI
Release of connections to the Flat Owners of Groups Housing Societies/Mult Storey buildings
SI
Conversion of existing LT tubewell connections to HT at Nigam’s cost
SI
Fixing of responsible for by passing the MCCB of DTs
SI
Implementation of short term open access within the State of Haryana and Transmission and other related charges to be recovered from the short term Open Access Customers
SI
Mode of payment of bills by consumers
SI
Citizen’s Charter/Consumer’s Charter of Rights - Standards of Performance of Distribution Licensee
SI
Guidelines/Modalities for release of electric connections in Police Line Colonies/other Govt. Colonies
SI
Incentives to Nigam’s employees
SI
Instructions for dealing with the cases of theft of Electricity
SI
Campaign for checking of theft of energy—Isolating and highlighting the energy thieves
SI
Procedure for levy of surcharge in case of part-payment of energy bill by the consumers
SI
Applicability of tariff for supply to Tubewell within Municipal Limits
SI
Campaign for checking of theft of energy—Isolating and highlighting the energy thieves
SI
Campaign for checking of theft of energy—Isolating and highlighting the energy thieves
SI
Policy in respect of essential feeders
SI
Policy in respect of essential feeders
SI
Issue of demand notices to AP applicants
SI
Provision of Electronic LT-CT Meter on New Connection
SI
Levy of Fuel Surcharge Adjustment (FSA) Claim
SI
Policy in respect of essential feeders
SI
Levy of peak load exemption charges to HT Industrial consumers.
SI
Conversion of feeding source from Rural to Urban mode cost of line thereof.
SI
Levy of peak load exemption charges to HT Industrial consumers.
SI
Levy of peak load exemption charges to HT Industrial consumers.
SI
Recovery of arrears of defaulting consumers.
SI
Provision of Electronic LT-CT Meter on New Connection.
SI
Return of defective meters and Meter Cup Board by the field staff.
SI
Providing of MCCB on NDS connections in the Nigam.
SI
Reading of 11 KV feeders having separate ledgers – all consumer
meters on a feeder to be read in one/two days
SI
Inspection of Distribution Transformers by DGM/OP at the time of
energisation.
SI
Release of AP connection at right Murba/Killa number.
SI
HERC Regulations on Standards of Performance of
Distribution Licensee.
SI
Policy in respect of essential feeders
SI
Policy in respect of essential feeders
SI
Acceptance of payment made in excess to the energy bill raised /
dues outstanding.
SI
Obtaining of Surety bond alongwith A&A form.
SI
Checking of accuracy- single/three phase meters.
SI
Loss prevention Incentive Scheme.