THE FOLLOWING INSTRUCTIONS HAVE BEEN DELETED BECAUSE THESE ARE NOT APPLICABLE AT PRESENT.  
Instruction No. SUBJECT
  SECTION – I
9 Calculation of Minimum Consumption Guarantee (MCG)
13 Issue of Demand Notice viz a viz shortage of fund/material etc. 
29 Temporary additional supply to permanent consumers.
31 Keeping applicants informed about the whereabouts of their application.
32 Splitting of Industrial load.
39 Supply of power for load exceeding 100 kW.
  SECTION – II
51 M.C.G.- Short Title, Application and Assessment thereof.
52 Restricted House Supply.
53 Recovery of M.C.G. Amount.
54 Reduction or extension in load – MCG
55 Change of Name.
56 Splitting of Industrial Load.
57 Levy of MCG, when service line is tapped.
58 Atta Chakki Load.
59 Revision of Amount of MCG.
60 Power to waive off or to shift the period of MCG.
  SECTION – III
82 Already deleted in 1985 edition.
85 Service equipment charges.
87 Electrification of Villages/ lying of complete L.D. system with periphery of Villages/charging of service rental from consumers.
  SECTION – IV
105 Installation of separate meters for segregating large & small loads at Industrial premises.
119 Purchase of meter by the consumer.
122 Procedure for billing where the Maximum Demand Indictor get defective or not installed from the date of connection.
  SECTION – V
127 Interpretation of Factory lighting clause.
128 Compounding in schedule CS & DS.
129 Commercial supply viz a viz motive power loads.
130 Bulk supply for general or mixed load at single point.
133 Lamp Renewal Charges as applicable to Tariff Schedule S.L.
134 Fixation of monthly lamp maintenance charges for special type of fittings provided by the load bodies.
135 Industrial consumers- Correction Factor in demand charges to compensate the effect of Low Power Factor.
136 Levy of MMC on I.B. connections released for floodwater relief pumping stations.
137 Applicability of Bulk Supply Tariff to the Hospitals, Nursing Homes managed by individual/societies or institutions.
  SECTION – VI
  Billing of consumers on Connected Load basis when a MDI is not available to be installed at consumer’s premises.
160
161 Un-authorized Extension of load- Overhauling of consumer’s accounts.
163 Spot billing of Large Supply consumers.
  SECTION – VII
177 Disconnection of consumer’s governed by MCG.
  SECTION – VIII
203 Procedure of dealing with theft of energy cases.
204 Reconnection of supply to consumer’s caught stealing energy.
  SECTION – X
254 Load Surveys.
255 Justified service length for tubewell connections.
256 Prejudice use of supply.
257 Overcoming of shortage of three phase meters.
258 Installation of meter for General & Industrial Supply.
261 Improvement of power factor.